Engineering & Manufacturing of Industrial Switchgear 026-91300090 · LV / MV / Control
Tavazon Sanat Paydar
Special Systems

ATS Panels

ATS panels provide automatic transfer between normal and emergency power sources where continuity of supply is important. Transfer logic, interlocking and power devices are selected according to the project operating philosophy.

The panels can be integrated with generator systems, local control circuits and the control signals required by the project power-management scheme.

StandardIEC 61439 / project specifications SystemControl / LV
ATS Panels
Tavazon Sanat product portfolioControl / LV
Applications & Configurations

Engineered around the requirements of each project

The final configuration is selected from project documents, operating philosophy, installation conditions and approved equipment requirements.

Typical Applications

Emergency powerGenerator systemsCritical facilitiesAutomatic source transfer

Configurations

  • Normal / emergency sources
  • Auto / manual operation
  • Transfer & retransfer logic
  • Electrical / mechanical interlocking
  • Generator start / stop interface
  • Status & alarm signals
ENGINEERING GUIDE

ATS engineering for reliable source transfer

An ATS is not simply two breakers. Source monitoring, transfer timing, interlocking, generator commands, retransfer conditions and manual operation must match the project operating philosophy.

1

Transfer Logic

Source monitoring, generator start, delay timing, transfer and return sequences defined for the application.

2

Interlocking & Safety

Mechanical/electrical interlocking prevents unintended source paralleling according to the selected architecture.

3

Power & Control

Breaker ratings, fault level, command circuits, signals and generator interface engineered together.

RFQ engineering checklist

  • Normal/emergency source
  • Rated current/fault level
  • Generator interface
  • Transfer logic
  • Interlocking
  • Auto/manual modes

Related technical reading

Use the technical knowledge base to review concepts that affect selection, protection and operation.

Technical Basis

Technical specifications are defined from the actual project requirements

Final panel ratings and configuration — including rated current, short-circuit requirements, degree of protection, internal separation and major equipment — are confirmed after review of the approved project documents and operating requirements.

DESIGN BASIS Project documents & operating requirements SLD, load/feeder data, protection requirements and installation conditions are reviewed together.
REFERENCE STANDARD IEC 61439 / project specifications The applicable standard is considered together with the project specification and approved drawings.
FINAL RATINGS Confirmed during engineering review Project-specific ratings are not assumed; they are derived from the actual electrical system and approved requirements.
StandardIEC 61439 / project specifications
FAQ

Questions commonly asked before an RFQ

Answers are intentionally engineering-focused; final ratings and configuration are determined from project documents.

ATS vs manual changeover?

ATS performs transfer automatically based on source conditions and control logic, while manual changeover depends on operator action.

Can the ATS start a generator?

In generator-backed systems, the ATS control logic can manage start/stop commands and readiness signals per project philosophy.

Is interlocking required?

Preventing unintended simultaneous connection of sources is a fundamental ATS design consideration; the method depends on equipment architecture.

Are transfer delays adjustable?

Detection, generator start, warm-up, transfer and return delays can be defined according to the selected control architecture.

What drives ATS panel price?

Rated current, source arrangement, breaker type, generator interface, fault level, transfer logic, operating modes and equipment brands are major factors.

Engineering Review

Need this product family for your project?

Send project drawings and specifications so our engineering team can review the required configuration.