Power Quality

Capacitor Banks & Power Factor Correction

Capacitor-bank and power-factor-correction panels are engineered to compensate reactive power, improve power factor, reduce unnecessary network current and release upstream electrical capacity. Total kVAr and step arrangement are selected from the target power factor, actual load profile and network conditions rather than from a fixed catalogue size.

The engineering process coordinates the power-factor controller, capacitor-step sizing, switching devices, protection, discharge circuits, ventilation and thermal behaviour. Where non-linear loads are present, harmonic conditions are reviewed and detuned reactors are considered when required. The final assembly is coordinated with IEC 61439, capacitor requirements and the project operating conditions.

StandardApplicable IEC and project specifications SystemLV
Capacitor Banks & Power Factor Correction
Tavazon Sanat product portfolioLV
Applications & Configurations

Engineered around the requirements of each project

The final configuration is selected from project documents, operating philosophy, installation conditions and approved equipment requirements.

Typical Applications

Power-factor correctionReactive-power compensationIndustrial networksDistribution systems

Configurations

  • kVAr sizing & target power factor
  • Automatic PFC controller
  • Step sizing & arrangement
  • Switching & protection per step
  • Harmonic review / detuned reactor when required
  • Discharge, ventilation & thermal management
ENGINEERING GUIDE

Capacitor-bank engineering starts from the real network

Required kVAr, step arrangement and switching equipment should be based on reactive power demand, target power factor, load profile and harmonic conditions. A fixed nominal capacity alone is not enough for reliable design.

1

kVAr & Step Sizing

Total capacity and step sequence selected from target power factor and load profile.

2

Switching & Protection

PFC controller, capacitor-duty switching, protection and discharge circuits coordinated for each step.

3

Harmonics & Thermal

Non-linear loads, possible detuned reactors, ventilation and internal temperature reviewed before final design.

RFQ engineering checklist

  • Reactive-power demand
  • Current/target PF
  • Load profile
  • Harmonic level
  • Step sizing
  • Thermal/protection

Related technical reading

Use the technical knowledge base to review concepts that affect selection, protection and operation.

Technical Basis

Technical specifications are defined from the actual project requirements

Final panel ratings and configuration — including rated current, short-circuit requirements, degree of protection, internal separation and major equipment — are confirmed after review of the approved project documents and operating requirements.

DESIGN BASIS Project documents & operating requirements SLD, load/feeder data, protection requirements and installation conditions are reviewed together.
REFERENCE STANDARD Applicable IEC and project specifications The applicable standard is considered together with the project specification and approved drawings.
FINAL RATINGS Confirmed during engineering review Project-specific ratings are not assumed; they are derived from the actual electrical system and approved requirements.
StandardApplicable IEC and project specifications
AVL · MINISTRY OF PETROLEUM

Industrial project vendor qualification

Tavazon Sanat holds documented registration in the Ministry of Petroleum domestic manufacturers long vendor resources list for a related industrial electrical scope. Ask our team to confirm product category and current purchaser-specific eligibility for your project.

FOOLAD TECHNIC · APPROVED VENDOR

Foolad Technic approval — capacitor bank manufacturing

Capacitor-bank manufacturing is explicitly included in Foolad Technic letter 05/ou/9411. The approval requires inspection supervision during manufacturing; final product and tender requirements must also be observed.

Lighting distribution Capacitor banks Local control Associated structures
Letter 05/ou/9411 · 1405/07/08 · Inspection during manufacturing required
Foolad Technic vendor approval letter, no. 05/ou/9411 Official document
PRICING & ENGINEERING

Capacitor bank and PFC panel pricing

PFC panel costs depend on kvar capacity, step count, capacitors, regulator and contactors, protection, busbars, ventilation and any necessary detuning reactors.

Attach the load profile or active power demand, current and target power factors and, if available, the harmonic survey and required capacity or step configuration.

FAQ

Questions commonly asked before an RFQ

Answers are intentionally engineering-focused; final ratings and configuration are determined from project documents.

How is capacitor-bank size calculated?

Capacity is derived from active power, current power factor and target power factor, then divided into suitable steps based on the load profile.

Why does the number of steps matter?

Step arrangement affects control accuracy and switching frequency, so it should follow how the load changes.

When is a detuned reactor needed?

Where harmonics and resonance risk are significant, reactor-based design should be evaluated from measurement or network study.

What determines capacitor-bank price?

Total kVAr, number of steps, capacitor and controller brands, switching equipment, reactors, protection, enclosure and testing scope are key factors.

Is capacitor correction suitable for every network?

Correction should match load and network conditions. Harmonic-rich systems, especially those with VFD loads, require closer engineering review.

Engineering Review

Need this product family for your project?

Send project drawings and specifications so our engineering team can review the required configuration.